Latest Updates
- 90% of lots sold (remaining lots located on gas line)
- 2 lots on Ira Morgan Way (located on the Trans Canada Pipeline) remain unsold
- Stop sign on Ira Morgan at Whiteside Way = complete
- Stop sign at the intersection of Whiteside Way at Iveson = complete
- Connecting road between Adam Baker Way and Iveson Dr = complete
Phase 1 Action List
Item | Action |
Complete |
Incomplete |
85% of lots sold (17/20 lots sold) | NA | ||
Stop Sign (Ira Morgan at Whiteside) | Complete 2016 |
✔ |
|
Speed Limit Signs (40km/h) | Pending |
× |
|
Drainage Problems (Iveson & Ira Morgan) | None |
× |
|
Connecting Road (Adam Baker & Iveson) | Complete 2017 | ✔ |
|
Fix asphalt at Iveson and 8th Line | Complete 2017 | ✔ |
|
Potholes (at grade change on asphalt) | Complete 2017 |
✔ |
|
Clarify Subdivision Phase Boundaries (as city had incorrect info) | Complete 2017 |
✔ |
|
Request Subdivision Agreement | Complete 2017 |
✔ |